Apr 24, 2013Beralmar has been assigned the task of modifying a dryer belonging to the LA ESCANDELLA group in Agost (Alicante).
Although LA ESCANDELLA is possibly best known as a tile manufacturer w... [+] -
Mar 28, 2013BERALMAR is preparing to supply a new micronized-petcoke firing installation. It is an order for a MICROMATIC system from the SLAVONIJA IGM ceramic plant in Našice, eastern Croatia, owned by NEXE. It... [+] -
Feb 27, 2013BERALMAR has just booked a new order for solid fuel firing facility in Morocco. It is a MICROMATIC installation for the BRIQUETERIE TARIK in Tangiers, which will substitute approximately 80% of the co... [+] -
Jan 30, 2013BERALMAR has just received an order for a biomass heat generator from the TOP Banja Luka ceramics plant, near Banja Luka, in the north of Bosnia and Herzegovina.
It is a set formed by a... [+] -
Jan 30, 2013BERALMAR has received a new order for a solid fuel firing installation. It is a PROMATIC installation for the I-Crni in Cazin ceramics plant (Bosnia and Herzegovina), in a beautiful mountain region in... [+] -
Sep 27, 2012The BRIQUETERIE BELBRIQUE in Berrechid (Morocco) has decided to replace up to 70% of fuel oil consumption in its kiln with micronized petcoke, using a MICROMATIC model which will be delivered in the c... [+] -
Jul 27, 2012BERALMAR has just completed the commissioning of an installation of gas firing equipment combined with previously existing fuel oil injection units, resulting in hybrid units of gas and fuel injection... [+] -
Jul 27, 2012BERALMAR has just received an order from Morocco for 3 sets of hot clean air generators that use biomass, each with a power of up to 2,000,000 Kcal/hour (2,326 kW). Each set is comprised of:
<... [+] -
Jun 28, 2012BERALMAR has been assigned a new engineering project to build a new factory in Krasnoyarsk (Siberia, Russia). The plant, owned by major local industrial group ARBAN, will have a daily production of 20... [+] -
Jun 27, 2012BERALMAR has just received an order for a new solid-fuel firing installation. It specifies the installation of a MICROMATIC model in one of the kilns of the STRAŽILOVO plant in Sremski Karlovci (Serb... [+] -
Apr 27, 2012BERALMAR has once again been chosen to build a new plant in Algeria. The plant in question is the future Tizi Ouzou BRIQUETERIE AMRAOUA in the country’s centre-north region.
This new ... [+] -
Mar 23, 2012BERALMAR has just received a new order for a solid fuel firing facility in Hungary. This is a MICROMATIC facility for the KUNSÁGI TÉGLAIPARI ceramics plant in Kisújszállás, in the eastern part of... [+] -
Mar 22, 2012BERALMAR is working on an important new project. This is the provision of a tunnel kiln and dryer for the new production line at CERÁMICA DEL ESTE in Santa Cruz de la Sierra (Bolivia).
... [+] -
Feb 23, 2012BERALMAR has just booked a new order for solid fuel firing facility in Morocco. It is the BRIQUETERIE SAMARRA in Tangiers, which has ordered a MICROMATIC installation which uses micronized petroleum c... [+] -
Jan 31, 2012BERALMAR has just received its first order for a solid fuel firing facility in Macedonia. The MICROMATIC unit will be installed in a tunnel kiln at the CIGLANA KUMANOVO works in the town of the same n... [+] -
Dec 29, 2011BERALMAR has just received an order to supply a complete line for BRIQUETERIE TIMADANINE in Adrar (Algeria).
BRIQUETERIE TIMADANINE is already a BERALMAR customer, since in 2009 it was ... [+] -
Nov 29, 2011BERALMAR has started work on the design and construction of a tunnel kiln for NUEVA CERÁMICA CAMPO in Pontevedra (Spain). The kiln will be 123.9 metres long and 4.16 metres wide, with a useful height... [+] -
Oct 27, 2011BERALMAR has just commissioned an installation consisting of a PULS combustion chamber for solid fuels coupled to a GB heat exchanger, to provide the clean, warm air needed in the dryer at the MIDABRI... [+] -
Jun 22, 2011BERALMAR has just received its first order for a solid fuel firing facility in Albania. It is for a PROMATIC system, soon to be installed in the tunnel kiln at the KID ALB Sh.p.k. ceramics plant in Ma... [+] -
May 25, 2011BERALMAR has just booked a new order for solid fuel firing facility in Bosnia. It is for a PROMATIC system, soon to be installed in a kiln belonging to TOP ceramics in Banja Luka, the capital of Repu... [+] -
Feb 22, 2011BERALMAR began operations in 1964 with the manufacture of fuel oil jets for hoffmann kilns. Almost half a century has passed and the company has experienced important changes, but despite the wide ran... [+] -
Feb 22, 2011BERALMAR has received the first order for a solid fuel firing installation in Bosnia and Herzegovina.
It will be a PROMATIC facility which will be installed in the kiln at the TVORN... [+] -
Jan 3, 2011In 2000, BERALMAR provided a FORNTHERMIC tunnel kiln and a MESTRAL model semi-continuous shelf dryer for the production of 400 tonnes/day for the BRIQUETERIE EL RYM in Annaba (Algeria). The project... [+] -
Dec 3, 2010BERALMAR has commissioned a new factory in Nador (Morocco). It is the SALAMABRIQ ceramics factory, owned by the Salama family, who had previously relied on BERALMAR for the construction of a tunnel ki... [+] -
Jul 1, 2010LADRILLERÍA SANTA FÉ, the largest ceramic group in Colombia, has ordered four kilns from BERALMAR for their solid fuel firing facilities. The system chosen by LADRILLERÍA SANTA FE is the most s... [+] -
Jul 1, 2010BERALMAR has received an order for a MICROMATIC solid fuel firing system for a kiln for firing refractory pieces for TATA REFRACTORIES LTD. in Belpahar (India), which is part of one of the most import... [+] -
Jul 1, 2010BERALMAR will again take part in the TECNARGILLA fair. Its 2010 edition will take place between 27 September and 1 October at the trade fair centre in Rimini (Italy). Visitors will find the BERALM... [+] -
Jun 1, 2010BERALMAR's leadership in solid-fuel firing continues to grow stronger thanks to three new orders from northern Morocco, specifically for BRIQUETERIE ARGILUX in Oujda, MIDABRIQ in Midar and SALAMABRIQ ... [+] -
Apr 1, 2010BERALMAR is preparing to supply a special solid fuel firing system for the BRICK DOTCOM ceramics facility at Kuala Kubu Bahru (Malaysia). It will be a BIOMATIC model, with technology suitable for firi... [+] -
Mar 1, 2010BERALMAR is supplying a petroleum coke firing facility for the CENTRO LATERIZI NAZIONALE ceramics works in Orte Scalo (Viterbo, Italy), owned by the FANTINI-SCIANATICO group, which has several p... [+] -
Mar 1, 2010The GB model heat generator is certainly one of the most successful solutions in the BERALMAR range. BERALMAR manufactures it with 5 different capacities: 600,000, 800,000, 1,000,000, 1,500,000 and 2,... [+] -
Feb 1, 2010BERALMAR has just received its first order for a solids combustion unit Ukraine. It is a PROMATIC system which will be installed in the tunnel kiln at the KIRPICHNIY ZAVOD VOLOCHISK ceramic factory... [+] -
Jan 1, 2010BERALMAR is developing two solid fuel firing facilities for the MAŠINAC-SVILAJNAC and MAŠINAC-STALAC ceramics plants, located in central Serbia. They are PROMATIC systems in both case, for produc... [+] -
Dec 1, 2009Syngas, or synthesis gas, is a gaseous fuel obtained from biomass combustion. It is a low energy gas with less than 1,540 kcal/Nm3 in calorific power, composed mainly of monoxide, hyrdrogen, methane, ... [+] -
Nov 1, 2009BERALMAR has just commissioned new new tunnel kiln for the MÁLYI TÉGLA ceramics plant in Mályi (Hungary). It is a PRESTHERMIC tunnel kiln which is characterised by its welded plate which along w... [+] -
Oct 1, 2009BERALMAR has carried out an important modernisation project at the SAVERDUN TERRE CUITE ceramics facility in Saverdun (France). SAVERDUN TERRE CUITE is a manufacturer of over one hundred formats and s... [+] -
Oct 1, 2009BERALMAR has just commissioned a new PROMATIC model solid fuel firing installation for the MLADOST group, in this case in the MLADOST-RAD facility in Vlasotince (Serbia). The new firing facility, d... [+] -
Aug 1, 2009BERALMAR has been commissioned to carry out a new project for CERÁMICA CTIBOR in La Plata, Argentina. It involves the design and construction of a tunnel kiln for the production of 350 tonnes/day of ... [+] -
Jul 1, 2009“Productivity is being able to do things that you were never able to do before.” – Jim Manzi. BERALMAR has a history which stretches back almost half a century, during which certain dates hav... [+] -
Jun 1, 2009BERALMAR has received three new orders for installing the PROMATIC system in Serbia. It will be installed in the tunnel kiln at the MLADOST RAD, FS GITARIC and FIT FS BECEJ factories. MLADOST R... [+]